The LCBP has made many recent reports and brochures available free for online download. Look for the “Download Now” link after the report listing. To order hard copies of reports, contact the LCBP office.
A complete list of LCBP Technical Reports is also available.
2024). Linking sediment and water column phosphorus dynamics to oxygen, temperature, and aeration in shallow eutrophic lakes. Water Resources Research, 60, e2023WR034813. https://doi.org/10.1029/2023WR034813
, , , , , , & (Brendan Wiltse, Paul Smith’s College Adirondack Watershed Institute, (2023). Quantifying the De-icing Salt Pollution Load to Mirror Lake and the Chubb River. Technical Report # 107B, Grand Isle, VT. Lake Champlain Basin Program.
Brendan Wiltse, Paul Smith’s College Adirondack Watershed Institute, (2023). Quantifying the De-icing Salt Pollution Load to Mirror Lake and the Chubb River. Technical Report # 107, Grand Isle, VT. Lake Champlain Basin Program.
Conley, Amy K., Howard, Timothy G., Shappell, Laura J., and White, Erin L., New York Natural Heritage Program, (2023). Using multi-metric modeling, field surveys, and online spatial tools to support conservation and management for flood resilience, water quality, and native species habitat. Technical Report # 106, Grand Isle, VT. Lake Champlain Basin Program.
Darby, H., University Of Vermont, (2023). Implementation of Whole Farm Nutrient Management to Reduce Phosphorus and Improve Farm Viability in the Lake Champlain Basin. Technical Report # 105, Appendices A-E, Grand Isle, VT. Lake Champlain Basin Program.
Darby, H., University Of Vermont, (2023). Implementation of Whole Farm Nutrient Management to Reduce Phosphorus and Improve Farm Viability in the Lake Champlain Basin. Technical Report # 105, Grand Isle, VT. Lake Champlain Basin Program.
Braun, D., Stone Environmental Inc., (2023). Assessment of Tile Drainage Systems in Addison County and the Jewett Brook Watershed (Technical Report # 104). Grand Isle, VT. Lake Champlain Basin Program.
Braun, D, Stone Environmental (2022). Development of a Treatment Train to Remove Phosphorus from Streamflow in the St. Albans Bay Watershed—Phase 2: Technical Feasibility Evaluation (Technical Report 85B). Grand Isle, VT. Lake Champlain Basin Program.